Fashionably Behind Schedule Funny Relatable Saying T Shirt — front view
Printed On Demand Made just for you
Ships in 1 business day Fast & reliable fulfillment
Est. Delivery Dec 1 – Dec 3
Random Funny Stuff

Fashionably Behind Schedule Funny Relatable Saying T Shirt

$11.95USD $16.13 Save 26%
Colour:
Size:
Chest (flat) Length
— —
Quantity:
Secure checkout

This relatable t-shirt is made for those who embrace their tendency to run late with style, proudly displaying the phrase Fashionably Behind Schedule in an elegant serif italic font. It strikes a balance between sophistication and playful honesty about time management quirks.

Ideal for anyone who often finds themselves arriving just a bit late but with flair, this shirt suits casual meetups, social events, or relaxed days when punctuality isn’t the priority. It’s a cheeky way to acknowledge being tardy without apology.

As a gift, it’s a charming choice for friends or family members known for their leisurely approach to time. It celebrates their unique timing with a touch of humor and class, making it a fun addition to any casual wardrobe.

  • 100% ring-spun cotton at roughly 4.3 oz/yd² (heather colours blend in polyester for the marled finish).
  • Classic unisex cut with a relaxed body, set-in sleeves, and side-seamed construction so the shirt keeps its shape wash after wash.
  • Pre-shrunk & side-seamed for shape retention
  • Direct-to-garment (DTG) printed with water-based inks
  • Made in Canada & USA — printed on demand, ships in 1 business day
  • Machine wash cold inside-out, tumble dry low, do not iron print
  • Runs true to size. Size up for a relaxed fit.

Ships in 1 business day — printed on-demand from our Canada + USA facilities.

  • Standard shipping starts at $5.95
  • Delivery typically 1–4 business days after dispatch
  • 30-day return policy — see our returns policy

Our unisex tee runs true to size. If you're between sizes, size up for a relaxed fit.

SizeChest (in)Length (in)
S1828
M2029
L2230
XL2431
2XL2632
3XL2833
4XL3034
5XL3235
6XL3436
Price $11.95USD